• LEADERSHIP AND EXPERTISE
    IN UNDERGROUND
    INFRASTRUCTURE

  • LEADER IN NATURAL
    GAS INFRASTRUCTURE
    CONSTRUCTION FOR 25 YEARS

Marathon Division Gaz is a general contractor that actively contributes to the success of its clients’ projects through collaboration, efficiency and expertise.

Marathon Division Gaz makes sustainable business relationships its priority, meeting clients’ evolving expectations and adapting to technological and regulatory changes. This approach has resulted in constant growth and success.

For the past 25 years, Marathon Division Gaz has held a general contract with Énergir (Gaz Métro).

Marathon Division Gaz has held an ISO-9001 quality management certification since 2002 and plays a leading role in the Environment, Health and Safety fields.

   

With the goal of improving its client service and positioning itself for constant growth, Marathon Division Gaz has established its new head office in the Saint-Laurent Industrial Park, strategically located near the Montreal’s main highway axes.

The new location has spacious facilities allocated to offices, warehousing, fabrication, mechanical team and outdoor storage etc.

Info-Excavation 2014, Recognition Award, Damage Prevention, Gold Mention;

Parchemins d’Excellence (Excellence Scrolls) awarded by Énergir (Gaz Métro) to the top performing service providers during annual evaluations.

Marathon Division Gaz carries out civil engineering projects, specializing in installation and replacement of underground distribution networks, particularly in the field of natural gas. We capitalize on our own mechanical team.

As a general contractor, we help our clients achieve their quality, deadline and budget objectives.

Marathon Division Gaz offers services covering the natural gas distribution market throughout Québec and Eastern Canada.

Marathon Division Gaz has acquired relevant experience in projects involving gas or other pipelines, aqueduct and sewer pipes.

Our teams are currently working in the following regions: Island of Montréal, Laurentians and Abitibi. We have also completed major projects in the Montérégie and Mauricie regions. Every year, we install an average of 30 kilometres of pipeline and connect 2500 clients.

BEAUHARNOIS

(Montérégie)

BEAUHARNOIS
(Montérégie)

Specific contract

Client: Énergir (Gaz Métro)

Duration: August 2016 to October 2016 (6 weeks)

Description:

Installation of 6 km of steel and plastic pipeline (4 - 8 inch D) to serve an industrial park in Beauharnois. Horizontal Directional drilling under a river.

PIPELINE BORE HIGHWAY 20 / TURCOT INTERCHANGE

(Montreal-West)

PIPELINE BORE HIGHWAY 20 / TURCOT INTERCHANGE
(Montreal-West)

Included in the general contract

Client: Énergir (Gaz Métro)

Duration: October 2015 to November 2015 (5 weeks)

Description:

Horizontal directional drilling, deviation and installation of 121 m of 8 inch. plastic natural gas pipe to allow the demolition of a portion of highway 20 for the Turcot Interchange mega-project.

BONSECOURS

(Montréal-Est)

BONSECOURS
(Montréal-Est)

Included in the general contract

Client: Énergir (Gaz Métro)

Duration: April and May 2015 (2 months)

Description:

Renewal of 475 m of pipeline and 9 client connections, dealing with the constraints of the historic sector of Old Montreal. All construction projects have their special characteristics. Our team's knowhow allows us to find the best possible method for each of them.

QUÉBEC LITHIUM

(Abitibi)

QUÉBEC LITHIUM
(Abitibi)

Specific contract

Client: Énergir (Gaz Métro)

Duration: June 2014 to November 2014 (6 months)

Description:

Construction of a new network of 35 km of 6-inch steel pipeline, pressure rating 2400 kPa, in the right of way of provincial roads serving the Quebec Lithium mine in La Corne.

WESTMINSTER

(Montreal)

WESTMINSTER
(Montreal)

Included in the general contract

Client: Énergir (Gaz Métro)

Duration: August 2013 to September 2013 (2 months)

Description:

Construction of 1.5 km of 12-inch steel pipeline in the town of Montreal-West. Horizontal directional bore under CN railroad tracks +-100 m.

PIPELINE BORE UNDER CN RAILROAD

(Montreal-East)

PIPELINE BORE UNDER CN RAILROAD
(Montreal-East)

Included in the general contract

Client: Énergir (Gaz Métro)

Duration: May and June 2013 (7 weeks)

Description:

Bypass of 75 m of 12-inch steel pipe inserted in a 16 inch steel pipe; horizontal auger bore 5 m deep, under CN railroad right of way.

The Marathon Division Gaz team is recognized for its collaboration, adaptability and creativity.

CONSTRUCTION TEAM
  • 150 employees;
  • Experts in excavation, pipeline, fabrication, asphalt paving, concrete and landscaping;
  • Shop manufacturing according to ASME Z662.
PROFESSIONAL TEAM
  • Team of experienced managers, engineers estimators, contract administration and project planning and cost control;
  • Team of experts in quality management, health and safety management, environmental management;
  • Team of project technicians performing on-site planning, site surveying and billing;
  • On-site data collection with electronic tablets;
  • GPS tracking of key vehicles/equipment;
  • Site support: store management, heavy equipment maintenance shop, dispatching;
  • Large yearly budget allocated to employee training and development.